工人英文自我评价

人气:375 ℃/2023-03-16 09:12:48

工人英文自我评价如何写呢?我们一起来看一看:

工人英文自我评价写作方法:1、首先是开头部分,可以写工人的工作内容及工作职责;2、接着可以对自己的工作进行一个总结,包括工作态度、工作表现、获得的荣誉等;3、最后结尾部分写对自己的评价和今后努力的方向。

工人英文自我评价篇一

In the past five months, under the leadership of the Department of Engineering Services, and colleagues through the common struggle, after their own positive efforts to do the following work.

one. Work attitude, ideological work. Work attitude, I love my job very much, to be strict with oneself, to abide by the Engineering Department of the system, to maintain a responsible attitude to work, humility, learning, proactive, and constantly improve their technological level, and strive to lead the assignment of each task Do the best. Guide the installation work.

two. Guide the installation work. In Jinli permanent magnet installation combat work, through the equipment of the pipeline interface, rectifier cabinets and control cabinet wiring wire-line installation, deepened my understanding of the equipment process and line power supply and distribution. But also trained me to understand the electrical wiring schematic, the ability to connect pipe installation drawings. But also to learn the skills of cognitive equipment spare parts. Every step of the installation process is done carefully. Found that the installation of lye filter timely and correct installation. Although the smooth completion of the guidance, but through the work found in the control cabinet in the PLC model configuration and accessories detailed name, the role of functional understanding is not deep enough. The future focus on some technical drawings, working hours to the material security department cognitive accessories. Do not understand the issue of timely advice to colleagues and leaders. Equipment testing and debugging work.

Third, equipment testing and debugging work. In the workshop on the Saudi equipment debugging test, the power plant CNDQ-10 hydrogen production equipment startup sequence, PID parameter settings, have a certain understanding. But also on the working principle of rectification from shallow to deep understanding. Before the test to determine through-cylinder is 90 degrees, tee 180 degrees. Through ball valve modulation off. Jordan's pneumatic film regulating valve should do its initial adjustment, debugging process, such as equipment can not reach the system pressure, the actual level does not match with the host computer, pump damage has occurred, should be based on the actual situation of correct investigation.

Fourth, the future direction of work. Next month focused on the debugging phase of learning. Develop their own ability to find fault. The scene found the problem back to the leadership, more advice. In the future work to make up for deficiencies, work hard to do better.

工人英文自我评价篇二

I came to your company in August 2014 to work in accordance with the company's work requirements to work on different types of construction documents. I am in strict accordance with the company management system, found their work in the rigorous, efficiency has improved. The supervision and management of the receiving and archiving of information, ability to identify information has improved. As a supervisor of information I am the main job of the work with the professional supervision of the construction engineers of the project information to make strict checks.Because the project data is a true reflection of the results of the construction of the project, the information is in the process of building the formation of various forms of information records, and only the supervision of engineers, construction unit information staff to complete and do a good job with this work. In accordance with the contract, the completion of the construction process in the formation of documents, accumulation, test papers and archives. Preparation of monthly supervision, monthly supervision is the supervision department within a month of progress and supervision of the project summary, but also the relevant departments to check, assess the work of the Ministry of Supervision important basis for doing this work is very important to supervise the data Of the governance work, and supervision of data collection, collation and archiving.

I think a supervisor is not just a simple data collection, collection, collation of engineering information. Timely synchronization of data can reflect the quality of the construction site, progress, construction units, such as the level of work more than the actual situation. But also found that the work required by my company a great harvest, I am glad that they can grow up in such an environment. Work in the process, with an open mind to my colleagues to learn, to strengthen the professional skills of learning breakthrough. I would like to thank the company to provide such a platform, I will be more efforts to improve their level of their greatest potential to tap out.

<上一篇下一篇>

推荐

首页/电脑版/地图
© 2024 JiaChangBa.com All Rights Reserved.